Case Studies

Live Operations Case Study

Sanremo Festival Coverage

Executive Production, Technical Direction, and Live Operations Leadership

A joint media operation between fifthbell, ModoItaliano (Chile), and HNMag (Spain), led from Sanremo under live broadcast conditions.

Context

This was a joint venture between fifthbell, ModoItaliano (a Chilean media outlet), and HNMag (a Spanish publication). The goal was to deliver live coverage of the Sanremo Music Festival to Spanish-speaking audiences across multiple platforms.

I served as the Executive Producer — the person ultimately responsible for leading the operation, making editorial decisions, coordinating contributors, and ensuring broadcasts went live as planned.

The mission required coordinating on-site production in Italy with remote contributors from Chile and Spain, while handling press accreditation, interview scheduling, technical infrastructure, and multi-hour live broadcasts.

Crisis

The original broadcast plan depended on infrastructure and equipment operated remotely from Chile. That dependency became unreliable and jeopardized the entire operation.

This was not a minor inconvenience. The technical failures and coordination breakdowns threatened the viability of the coverage itself. With press credentials already issued and broadcast commitments already announced, the operation faced potential collapse days before the festival began.

The situation required immediate assessment and a decision about whether to continue, and if so, under what structure.

Decision

I made the decision to remove the failing external dependency and assume full operational control from Sanremo.

This was not a decision made lightly. It meant taking full responsibility for the success or failure of the operation from that point forward. It also meant redesigning the entire technical and operational workflow under extreme time pressure.

I brought the remaining team back into focus and re-centered the mission. The goal remained the same: deliver professional live coverage from Sanremo. The path to get there had to be rebuilt from scratch.

Rebuild

Signal Control

Shifted all broadcast signal routing to local infrastructure in Italy.

Production Control

Rebuilt the production workflow to operate independently from Sanremo.

Technical Direction

Consolidated technical decision-making under single operational authority.

Timeline

Complete architecture rebuild executed in approximately 3 days.

During this period, I handled editorial direction, technical direction, on-air decisions, and contributor coordination simultaneously. The rebuild required designing new workflows, configuring streaming infrastructure, and establishing communication protocols — all while continuing to conduct interviews and gather content for the broadcasts.

Execution

I led the operation under extreme schedule pressure. Press conferences began around 11am daily. Live broadcasts typically concluded between 2am and 3am. The work required minimal sleep and sustained operational focus across multiple consecutive days.

Responsibilities during execution included:

  • Interview coordination with artists and press representatives
  • On-air narrative direction and editorial decisions
  • Real-time production decisions during multi-hour broadcasts
  • Technical setup, monitoring, and teardown
  • Coordination of remote contributors across Italy and Spain
  • Troubleshooting and crisis response during live broadcasts

Outcome

~2,000

Total viewers (peak night)

4-5h

Average broadcast duration

3

Countries coordinated

  • Multi-hour live broadcasts delivered successfully from Sanremo
  • Contributors coordinated across Italy and Spain throughout the festival
  • The operation succeeded after the original plan collapsed
  • Complete rebuild executed under live operational pressure

Why It Mattered

This was not software work. This was operational leadership under pressure.

Software was one artifact inside a larger mission that involved coordinating people across time zones, making editorial decisions in real time, managing logistics under uncertainty, and executing live broadcasts while simultaneously handling crisis response.

The experience demonstrated the ability to:

  • Make difficult decisions under pressure when dependencies fail
  • Rebuild operational infrastructure rapidly when circumstances demand it
  • Lead distributed teams through uncertainty toward successful outcomes
  • Execute complex operations requiring sustained focus over extended periods

These are the same capabilities required to lead large-scale engineering initiatives, navigate organizational complexity, and deliver results when plans inevitably change.

The technical systems used in this operation are documented separately.

View fifthbell Systems →